{"id":1288,"date":"2015-07-18T09:29:33","date_gmt":"2015-07-18T06:29:33","guid":{"rendered":"https:\/\/odostroma.gr\/our-projects\/"},"modified":"2026-03-26T16:27:57","modified_gmt":"2026-03-26T13:27:57","slug":"our-projects","status":"publish","type":"page","link":"https:\/\/odostroma.gr\/en\/our-projects\/","title":{"rendered":"Our projects"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row parallax_style=&#8221;none&#8221; video_link=&#8221;&#8221; parallax_scroll_effect=&#8221;fixed&#8221;][vc_column][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4><span style=\"text-decoration: underline; color: #1c1c1c;\"><strong>Colored slurry seal:<\/strong><\/span><\/h4>\n<ul>\n<li aria-level=\"1\"><span style=\"color: #1c1c1c;\">MUNICIPALITY OF KAVALA<\/span><\/li>\n<\/ul>\n<p>Installation of photocatalytic and cool roofing membranes as part of the BIOCLIMATIC UPGRADE projects in areas of the Municipality<\/p>\n<ul>\n<li aria-level=\"1\">MUNICIPALITY OF ASPROPYRGOS<\/li>\n<\/ul>\n<p>Maintenance of Asphalt Pavements in Areas of the Municipality of Aspropyrgos Using Photocatalytic and Cold-Set Cementitious Thin-Layer Paving<\/p>\n<ul>\n<li aria-level=\"1\">MUNICIPALITY OF PINEIOS<\/li>\n<\/ul>\n<p>Road surface repair using a single layer of colored, non-skid micro-surfacing slurry seal (Type II)<\/p>\n<ul>\n<li aria-level=\"1\">MUNICIPALITY OF AIGIALIA<\/li>\n<\/ul>\n<p>Supply of materials and application of two successive layers of colored photocatalytic slurry seal on the beach of the Municipality of Aegialia<\/p>\n<p>&nbsp;<\/p>\n<h4><span style=\"color: #1c1c1c;\"><strong><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-963 alignleft\" src=\"https:\/\/odostroma.gr\/wp-content\/uploads\/2023\/07\/11.jpg\" alt=\"\" width=\"469\" height=\"352\" srcset=\"https:\/\/odostroma.gr\/wp-content\/uploads\/2023\/07\/11.jpg 800w, https:\/\/odostroma.gr\/wp-content\/uploads\/2023\/07\/11-300x225.jpg 300w, https:\/\/odostroma.gr\/wp-content\/uploads\/2023\/07\/11-768x576.jpg 768w\" sizes=\"auto, (max-width: 469px) 100vw, 469px\" \/><\/strong><\/span><\/h4>\n<h4><span style=\"text-decoration: underline; color: #1c1c1c;\"><strong>Black slurry seal:<\/strong><\/span><\/h4>\n<ul>\n<li aria-level=\"1\">AKTOR ATE \u2013 EGNATIA ODOS S.A.<\/li>\n<\/ul>\n<p>Laying of cold-mix asphalt on the Egnatia Highway (Pambotida Toll Plaza)<\/p>\n<ul>\n<li aria-level=\"1\">TERNA S.A. \u2013 CENTRAL GREECE MOTORWAY S.A.<\/li>\n<\/ul>\n<p>Construction of a Type III anti-skid cold-mix micro-surfacing on the left lane of the highway<\/p>\n<ul>\n<li aria-level=\"1\">MICHAEL M. TSONTOS S.A. &#8211; US MOD<\/li>\n<\/ul>\n<p>Installation of cold-laid anti-slip carpet at the U.S. Naval Support Facility in Souda, Chania.<\/p>\n<p>&nbsp;<\/p>\n<h4>Joints and Cracks:<\/h4>\n<ul>\n<li aria-level=\"1\">TERNA S.A. \u2013 INTRAKAT JOINT VENTURE<\/li>\n<\/ul>\n<p>Replacement of elastomeric joints with asphalt-based poured joints<\/p>\n<ul>\n<li aria-level=\"1\">DION ABETE \u2013 REGION OF CENTRAL MACEDONIA<\/li>\n<\/ul>\n<p>Joint Reconstruction Work on National Highway 2 (Thessaloniki\u2013Melissia) at the Axios Bridge and the Gallikos Bridge<\/p>\n<ul>\n<li aria-level=\"1\">AKTOR S.A. \u2013 EGNATIA ODOS S.A.<\/li>\n<\/ul>\n<p>Joint repairs on the Egnatia Highway (Western and Eastern Sectors)<\/p>\n<ul>\n<li>KOZANI STATE AIRPORT, FILIPPOS &#8211; CIVIL AVIATION AUTHORITY<\/li>\n<\/ul>\n<p>Sealing cracks in the runway maneuvering area<\/p>\n<ul>\n<li>TERNA S.A. &#8211; Egnatia Motorway &#8211; Western Section<\/li>\n<\/ul>\n<p>Repair &#8211; Filling of longitudinal cracks on the Egnatia Highway &#8211; Western Section<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<h4><span style=\"color: #1c1c1c;\"><strong><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1693 alignleft\" src=\"https:\/\/odostroma.gr\/wp-content\/uploads\/2026\/02\/\u03ba\u03bf\u03b6\u03b1\u03bd\u03b7\u03b1\u03b5\u03c1\u03bf-300x150.webp\" alt=\"\" width=\"466\" height=\"233\" srcset=\"https:\/\/odostroma.gr\/wp-content\/uploads\/2026\/02\/\u03ba\u03bf\u03b6\u03b1\u03bd\u03b7\u03b1\u03b5\u03c1\u03bf-300x150.webp 300w, https:\/\/odostroma.gr\/wp-content\/uploads\/2026\/02\/\u03ba\u03bf\u03b6\u03b1\u03bd\u03b7\u03b1\u03b5\u03c1\u03bf-1024x512.webp 1024w, https:\/\/odostroma.gr\/wp-content\/uploads\/2026\/02\/\u03ba\u03bf\u03b6\u03b1\u03bd\u03b7\u03b1\u03b5\u03c1\u03bf-768x384.webp 768w, https:\/\/odostroma.gr\/wp-content\/uploads\/2026\/02\/\u03ba\u03bf\u03b6\u03b1\u03bd\u03b7\u03b1\u03b5\u03c1\u03bf-1536x768.webp 1536w, https:\/\/odostroma.gr\/wp-content\/uploads\/2026\/02\/\u03ba\u03bf\u03b6\u03b1\u03bd\u03b7\u03b1\u03b5\u03c1\u03bf.webp 1600w\" sizes=\"auto, (max-width: 466px) 100vw, 466px\" \/><\/strong><\/span><\/h4>\n<h4><strong>Anti-corrosion Coatings:<\/strong><\/h4>\n<ul>\n<li aria-level=\"1\">TOMI SA \u2013 HOCHTIEF \u2013 Athens International Airport \u201cEleftherios Venizelos\u201d<\/li>\n<\/ul>\n<p>Application of a thin anti-skid layer of SLURRY SEAL \/ MICRO-SURFACING in the TWY D11 area of the eastern runway.<\/p>\n<ul>\n<li aria-level=\"1\">CIVIL AVIATION AUTHORITY &#8211; KOZANI &#8220;PHILIPPOS&#8221; AIRPORT<\/li>\n<\/ul>\n<p>Application of a non-skid slurry seal asphalt overlay in the runway touchdown zones and repair of localized pavement damage in sections of the runway.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<h4><span style=\"text-decoration: underline; color: #1c1c1c;\"><strong>Highway Management and Maintenance Systems<\/strong><\/span><\/h4>\n<ul>\n<li aria-level=\"1\">AKTOR S.A. \u2013 EGNATIA ODOS S.A.<\/li>\n<\/ul>\n<p>Collection, recording, and processing of the data comprising the RMMS (Routine Maintenance Management System) Road Register for the maintenance project of the Egnatia Highway.[\/vc_column_text][vc_empty_space][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row parallax_style=&#8221;none&#8221; video_link=&#8221;&#8221; parallax_scroll_effect=&#8221;fixed&#8221;][vc_column][vc_column_text css=&#8221;&#8221;] Colored slurry seal: MUNICIPALITY OF KAVALA Installation of photocatalytic and cool roofing membranes as part of the BIOCLIMATIC UPGRADE projects in areas of the Municipality MUNICIPALITY OF ASPROPYRGOS Maintenance of Asphalt Pavements in Areas of the Municipality of Aspropyrgos Using Photocatalytic and Cold-Set Cementitious Thin-Layer Paving MUNICIPALITY OF PINEIOS Road [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-1288","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/odostroma.gr\/en\/wp-json\/wp\/v2\/pages\/1288","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/odostroma.gr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/odostroma.gr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/odostroma.gr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/odostroma.gr\/en\/wp-json\/wp\/v2\/comments?post=1288"}],"version-history":[{"count":10,"href":"https:\/\/odostroma.gr\/en\/wp-json\/wp\/v2\/pages\/1288\/revisions"}],"predecessor-version":[{"id":1854,"href":"https:\/\/odostroma.gr\/en\/wp-json\/wp\/v2\/pages\/1288\/revisions\/1854"}],"wp:attachment":[{"href":"https:\/\/odostroma.gr\/en\/wp-json\/wp\/v2\/media?parent=1288"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}